|Build up dirty workshop wall || Complete || Build (stud partition) wall above existing disabled toilet wall to reach ceiling || || Insulation (some rockwool in loft), stud wood, plasterboard.
|Build up dirty workshop wall || Complete || Build (stud partition) wall above existing disabled toilet wall to reach ceiling || || Insulation (some rockwool in loft), stud wood, plasterboard.
|-
|-style="background: green"
|Clean and fill dirty workshop walls and ceiling || Cleaned. May need additional filling before painting || || || Filler, etc in Bancroft
|Clean and fill dirty workshop walls and ceiling || Cleaned. May need additional filling before painting || || || Filler, etc in Bancroft
|- style="background: yellow"
|- style="background: yellow"
|Paint dirty workshop walls || || || Walls and ceiling prepped || Paint, etc in Bancroft  
|Paint dirty workshop walls || One coat done || || Walls and ceiling prepped || Paint, etc in Bancroft  
|-
|-
|Electrics, trunking, lights, dirty sink, etc etc|| Unfinished list || || ||  
|Electrics, trunking, lights, dirty sink, etc etc|| Unfinished list || || ||  

Revision as of 13:08, 15 February 2019

Layout M

Current status

This page is a work in progress

Attention is focussed on getting the office side up and running before switching to the workshop.

  • Painting mostly done - some touch up will be needed once everything else is finishedt
  • Doors, frames, etc, need painting
  • Flooring fitted
  • Kitchen, toilet and aircon fitting started
  • Furniture arriving on 2/2/19!

To be decided

  • Do we want some kind of privacy/reflective/solar film on the windows?

Task status

Not ready to start
Can be started
In progress
Completed

Before opening

At the bare minimum, we need to have done something about...

Task Status Description Dependencies Required materials
Fire risk assessment Brian started this a while back, need to finish it A fire risk assessment needs to be carried out. Anyone can do it; the Government has a template on the web
Fire extinguishers Make things be not burning Risk assessment Unassessed
Fire action Fire action signs, fire exit signs, ensure there's a clear path to both exits Signage
First aid kit One for each side, or just one in the middle? Kitchen? Extra kit to cope with potential workshop injuries (eyewash?)
RIDDOR We should have an accident book (Brian should probably have one just for him) and policy on what to do about it.


Office side

Task Status Description Dependencies Required materials
Joint walls Complete Already in Bancroft
Sand walls/ceiling Walls/ceiling sanded except cupboard area Lightly sand the walls/ceiling with a fine grit paper. The aim is to just smooth the joint cement where it meets the plasterboard, and knock off any lumps. Toilet and office have been done, with the exception of the cupboard area Sander and sanding disks in Bancroft
Seal walls/ceiling Complete Paint over walls with plasterboard sealer/primer. Toilet and kitchen area done Sanded walls Already in Bancroft
Paint walls/ceiling Complete, barring any touch up which is required Paint walls and ceiling. Toilet and kitchen area to be painted with hardwearing paint (Dulux Diamond Matt). Everywhere else in bare-plaster white matte trade paint (ie, no sealing required on the other walls) Brushes, rollers, white matt trade paint
Fit lights 14/14 lights up plus emergency lights Cut holes where necessary for lights (some are already cut from having been fitted before) and clip lights into place Ceiling painted Already in Bancroft
Corner angles Just toilet corner to do. Fit protective aluminium corner angles to external corners on walls and around doorways Walls painted Angle pieces and contact adhesive (Evostik "Sticks like...") in Bancroft. Need some way to cut aluminium
Window sills Completed Fit sills to windows Walls painted Window sills, GripFill
Seal around windows Completed Remove protective film from windowframes and run sealant around the join between the windows and the walls Walls painted, sills fitted Suitable sealant (Wickes frame sealant) in Bancroft
Fit door stops Done Fit stops to frames of toilet and office/workshop door Required wood, etc, in Bancroft
Paint doorframes Central doorframe primed Paint doorframes Brushes, undercoat and gloss paint in Bancroft. Need some sort of flooring protection
Trim central doors Complete Trim a few mm of the bottom of the centre doors, so they don't stick on the carpet Electric plane (or manual plane if you're a masochist in need of some exercise)
Paint doors Central doors partially primed Paint the doors Central doors trimmed Brushes, undercoat and gloss paint in Bancroft.
Fit toilet floor Floor fitting in progress Fit (or have fitted) a floor to the toilet
Fit toilet Toilet fitted and screwed down/to wall, waste connected Fit the toilet Toilet floor Need waste plumbing connectors and screws to hold it down
Fit toilet sink and grab handles 6/6 handles fitted plus sink Fit the sink and the various grab handles which the disabled loo needs Toilet walls/ceiling painted Dot-and-dab wall plugs (in Bancroft)
Plumb in toilet and sink Complete Plumb in sink (hot and cold) and toilet (cold), leaving tees to allow connections to workshop sink Sink/toilet fitted, kitchen plumbing done, holes drilled for pipes to workshop TMV in Bancroft
Fit toilet accessories Fit bits and pieces to make the toilet useful: Toilet paper holder, soap dispener(?), paper towel holder(?), mirror, shelf for spare rolls, etc Toilet walls/ceiling painted Need to buy all these things
Fit toilet door Complete Fit the door, grab handle for the door, locking hardware Stops fitted, office floor fitted Door, hinges, disabled toilet locks. Grab handle came as part of toilet pack
Fit toilet switches, emergency light Complete Fit the lighting pull switch, emergency pull switch and reset button. Fit the emergency light (currently in the loft) Toilet walls/ceiling painted Everything already in Bancroft
Fit toilet fan Complete Fit the fan, connect to toilet light with an off-delay, duct the air to the outside world somehow Toilet walls/ceiling painted Fan, ducting, some way to get out through the back wall
Fit disabled alarm Complete Fit the alarm outside the toilet. Note that there is a spare cable for future expansion (a second alarm) Office wall painted Already in Bancroft
Privacy film Done Fit privacy film in toilet and cupboard windows Walls/ceiling painted Privacy film, window cleaner, squeegee
Box in meter/fusebox In progress. Outer frame build and covered. Waiting for kitchen worktop. Hide the fusebox away in some nice boxing-in. Needs to be able support worktop and allow access to fusebox Kitchen painted Some 34mm^2 wood in space can be used for frame. Need to buy material to cover box, possibly hinges to allow access to fusebox/meter
Block unused drains Concrete poured into unused (and blocked) drain up to 15cm below floor level, liquid DPC added. Second layer of DPC added. Cement up to floor level. Seal up unused drains below the floor Expanding foam and/or cement
Office floor Floor laid Some sort of floor, to be decided. Office walls/ceiling painted, unused drains sealed Suitable flooring
Skirting board About a third done Skirting boards around office floor Office walls/ceiling painted. Floor done? Skirting board (wood/acrylic?)
Aircon cage Built and at Bancroft awaiting A/C Build a cage to house the exterior A/C unit Being built using old toilet gates (recyling FTW)
Fit external aircon Fit the external A/C unit Cage External A/C unit, pipes, external cut-off switch in Bancroft. Need exterior-grade mains cable?
Fit office aircon Need to find an engineer Fit internal A/C unit External A/C unit F-Gas engineer
Build kitchen units All units built Assemble the kitchen units (500mm, 925mm corner, 600mm cupboard) Everything already in Bancroft
Fit cupboard unit in kitchen Complete Cupboard->wall Kitchen walls/ceiling painted, unit built Everything (cupboard, dot&dab drywall plugs) already in Bancroft
Fit units All fitted Units in place. Fit end board and plinth Kitchen walls/ceiling painted, units built Everything already in Bancroft
Water heater Mounted to wall. Plumbing and wiring done; it makes hot water. Heater bought and fitted, needs plumbing in Units built and fitted. Probably easier done before worktop goes on, but not essential Pretty much everything needed has been bought
Fit worktop and sink All done except some sealant Worktop on units, sink in worktop Units built Jigsaw, steady hand. Worktop & sink already in Bancroft.
Plumb in sink Complete Connect the sink up the hot and cold water, drain Worktop & sink fitted, water heater fitted May need some 15mm pipe connectors. Will need some drain pipe/connectors
Kitchen splashback Done Fit splashback above sink area Worktop/sink fitted Need some sort of splashback
Fit trunking Complete Fit trunking to kitchen and office walls Office walls/ceiling painted Trunking already in Bancroft. May need extra ends/corners.
Fill walls in cupboard area About half done Fill in any holes with suitable filler
Paint cupboard walls/ceiling Started. One coat of sealer on walls. Paint to follow. Paint walls and ceiling in cupboard area Brush, roller, white matt trade paint
Cover soil pipes in cupboard Cover the holes in the cupboard walls where the soil pipes enter the floor, in such a way that we can get to them if necessary. Something like an acrylic sheet screwed over the gap Cupboard walls painted Sheet, screws, wallplugs, countersink washers
Cap off plasterboard edge in cupboard Where the plasterboard stops in the cupboard area, use a strip of 12-15mm corner angle to protect the edge Cupboard walls painted Aluminium angle, contact adhesive
Run pipes for dirty workshop sink Holes drilled. Hot and cold pipes run as far as cupboard. Drill holes through walls to allow hot and cold pipes to pass through from the toilet to the dirty workshop, running along the back wall of the building Drills, pipe, pipe clips, etc, already in Bancroft
Fit wiring and sockets Complete. 30 double sockets in 5 RCBO-protected circuits Wire up the trunking, fit a switch to turn off several sockets at once for laser cutter Toilet walls/ceiling painted Need cable, trunking back-boxes, sockets, switch for laser cutter
Fit external socket A waterproof 13A socket (or two) one the external back wall, so we can power things outside if the need arises. Switched from inside, so people don't steal our 'leccy Trunking in place External socket, trunking-mounted internal switch
Fit external tap An outside tap on the back wall, plus an internal tap to stop miscreants playing with the external tap Toilet plumbing External tap, internal tap, some pipe
Laser cutter extraction Ducting run from laser cutter corner to loft, still needs fitting at either end, hole drilling to outside world Some sort of extraction to be fitted somehow Walls/ceiling painted, trunking in place Will need materials for this
Loft hatch Andy L is 95% of the way through this Fit a loft hatch Will need materials for this

Workshop side

Task Status Description Dependencies Required materials
Step protector Fit a metal cover to the office/workshop step to stop it getting chipped 52mm checkerplate corner angle in Bancroft
Take down lights
Fit suspended ceiling Need a quote for at least the parts, if not also the labour
Make good walls Clean, remove ivy residue, mould and flaky paint. Fill in areas where walls were removed
Build up dirty workshop wall Complete Build (stud partition) wall above existing disabled toilet wall to reach ceiling Insulation (some rockwool in loft), stud wood, plasterboard.
Clean and fill dirty workshop walls and ceiling Cleaned. May need additional filling before painting Filler, etc in Bancroft
Paint dirty workshop walls One coat done Walls and ceiling prepped Paint, etc in Bancroft
Electrics, trunking, lights, dirty sink, etc etc Unfinished list
Fill gaps in floor Mostly done Sand, cement in Bancroft. May need painting/sealing afterwards.

General building

Task Status Description Dependencies Required materials
Repoint external walls Need to find someone who can do this Mortar (and some brick) has suffered from frost where the hoarding was on the front wall. A few bricks probaby need replacing, sections of wall need repointing A builder (this involves powertools on the street; getting someone in seems prudent)
External wheelchair ramps Build up small ramp to doors from pavement level using cold lay tarmac Cold lay tarmac and bitumen spray in Bancroft
External lighting Do we want this? Some external lights over the doors (?) External lighting, switching mechanism
Access control Paul is investigating some electronic lock mechanism Some sort of not-a-key way of getting into the building, and locking it up again TBD
Plantlife Kill off the things growing on/by the building Mosskiller (roof), weedkiller (walls), secateurs and saws